ZONING CODES OF CIVIL ENGINEERING CONSTRUCTION PROJECTS BASICS


Like building codes, zoning codes are established under the police powers of the state, to protect the health, welfare, and safety of the public. Zoning, however, primarily regulates land use by controlling types of occupancy of buildings, building height, and density and activity of population in specific parts of a jurisdiction.

Zoning codes are usually developed by a planning commission and administered by the commission or a building department. Land-use controls adopted by the local planning commission for current application are indicated on a zoning map.

It divides the jurisdiction into districts, shows the type of occupancy, such as commercial, industrial, or residential, permitted in each district, and notes limitations on building height and bulk and on population density in each district.

The planning commission usually also prepares a master plan as a guide to the growth of the jurisdiction. A future land-use plan is an important part of the master plan. The commission’s objective is to steer changes in the zoning map in the direction of the future land-use plan.

The commission, however, is not required to adhere rigidly to the plans for the future. As conditions warrant, the commission may grant variances from any of the regulations.

In addition, the planning commission may establish land subdivision regulations, to control development of large parcels of land. While the local zoning map specifies minimum lot area for a building and minimum frontage a lot may have along a street, subdivision regulations, in contrast, specify the level of improvements to be installed in new land-development projects.

These regulations contain criteria for location, grade, width, and type of pavement of streets, length of blocks, open spaces to be provided, and right of way for utilities.

A jurisdiction may also be divided into fire zones in accordance with population density and probable degree of danger from fire. The fire-zone map indicates the limitations on types of construction that the zoning map would otherwise permit.

In the vicinity of airports, zoning may be applied to maintain obstruction-free approach zones for aircraft and to provide noise-attenuating distances around the airports. Airport zoning limits building heights in accordance with distance from the airport.

BUILDING GYPSUM CHARACTERISTICS BASIC INFORMATION


Compared with other binding materials, building gypsum has the following characteristics:

1. Fast Setting and Hardening
The setting time of building gypsum changes with the calcination temperature, grinding rate and impurity content. Generally, mixed with water, its initial setting needs just a few minutes at room temperature, and its final setting is also within 30min.

Under the natural dry indoor conditions, total hardening needs about one week. The setting time can be adjusted according to requirements.

If the time needs to be postponed, delayed coagulant can be added to reduce the solubility and the solution rate of building gypsum, such as sulfite alcohol wastewater, bone glue activated by borax or lime, hide glue, and protein glue; if it needs to be accelerated, accelerator can be added, such as sodium chloride, silicon sodium fluoride, sodium sulfate, and magnesium sulfate.

2. Micro-expansion
In the hardening process, the volume of building gypsum just expands a little, and there won’t be any cracks. Thus, it can be used alone without any extenders, and can also be casted into construction members and decorative patterns with accurate size and smooth and compact surface.

3. Big Porosity
After hardening, the porosity of building gypsum can reach 50%-60%, so its products are light, insulating, and sound-absorbing. But these products have low strength and large water absorption due to big porosity.


4. Poor Water Resistance
Building gypsum has low softening coefficient (about 0.2-0.3) and poor water resistance. Absorbing water, it.wil1 break up with the freeze of water. Thus, its water resistance and frost resistance are poor, not used outdoors.

5. Good Fire Resistance
The main component of building gypsum after hardcning is CaS04*2H20. When it contacts with fire, the evaporation of crystal water will absorb heat and generate anhydrous gypsum which has good thermal insulation. The thicker its products are, the better their fire resistance will be.

6. Large Plastic Deformation
Gypsum and its products have an obvious performance of plastic deformation. Creep becomes more serious especially under bending load. Thus, it is not used for load-bearing structures normally. If it is used, some necessary measures need to be taken

electrical engineering tutorials