Showing posts with label SURVEY. Show all posts
Showing posts with label SURVEY. Show all posts

SURVEYING CLASSIFICATION BASIC INFORMATION AND TUTORIALS


What Are The Classification Of Surveying?

Surveying may be classified on the following basis:
(i) Nature of the survey field
(ii) Object of survey
(iii) Instruments used and
(iv) The methods employed.

Classification Based on Nature of Survey Field
On this basis survey may be classified as land survey, marine or hydraulic survey and astronomical survey.

Land Survey. It involves measurement of various objects on land. This type of survey may be further classified as given below:

(a) Topographic Survey: It is meant for plotting natural features like rivers, lakes, forests and hills as well as man made features like roads, railways, towns, villages and canals.

(b) Cadestal Survey: It is for marking the boundaries of municipalities, villages, talukas, districts, states etc. The survey made to mark properties of individuals also come under this category.

(c) City Survey: The survey made in connection with the construction of streets, water supply and sewage lines fall under this category.

Marine or Hydrographic Survey. Survey conducted to find depth of water at various points in bodies of water like sea, river and lakes fall under this category. Finding depth of water at specified points is known as sounding.

Astronomical Survey. Observations made to heavenly bodies like sun, stars etc., to locate absolute positions of points on the earth and for the purpose of calculating local time is known as astronomical survey.

Classification Based on Object of Survey
On the basis of object of survey the classification can be as engineering survey, military survey, mines survey, geological survey and archeological survey.

(a) Engineering Survey: The objective of this type of survey is to collect data for designing civil engineering projects like roads, railways, irrigation, water supply and sewage disposals. These surveys are further sub-divided into:

Reconnaissance Survey for determining feasibility and estimation of the scheme.

Preliminary Survey for collecting more information to estimate the cost of the project, and

Location Survey to set the work on the ground.

(b) Military Survey: This survey is meant for working out plans of strategic importance.

(c) Mines Survey: This is used for exploring mineral wealth.

(d) Geological Survey: This survey is for finding different strata in the earth’s crust.

(e) Archeological Survey: This survey is for unearthing relics of antiquity.

Classification Based on Instruments Used
Based on the instruments used, surveying may be classified as:

(i) Chain survey
(ii) Compass survey
(iii) Plane table survey
(iv) Theodolite survey
(v) Tacheometric survey
(vi) Modern survey using electronic distance meters and total station
(vii) Photographic and Aerial survey

The survey is taught to students mainly based on this classification.

Classification Based on Methods Employed
On this basis surveying is classified as triangulation and traversing.
(i) Triangulation: In this method control points are established through a network of triangles.
(ii) Traversing: In this scheme of establishing control points consists of a series of connected points established through linear and angular measurements. If the last line meets the starting point it is called as closed traverse. If it does not meet, it is known as open traverse.

SURVEYING OBJECTS AND USES BASIC INFORMATION AND TUTORIALS


What Is Surveying and What Are The Objects And Uses Of Surveying?

Surveying is the art of making measurements of objects on, above or beneath the ground to show their relative positions on paper. The relative position required is either horizontal, or vertical, or both.

Less precisely the term Surveying is used to the measurement of objects in their horizontal positions. Measurements to deteremine their relative vertical positions is known as levelling.

OBJECT AND USES OF SURVEYING
As stated in the definition, object of surveying is to show relative positions of various objects of an area on paper and produce plan or map of that area. Various uses of surveying are listed below:

(i) Plans prepared to record property lines of private, public and government lands help in avoiding unnecessary controversies.

(ii) Maps prepared for marking boundaries of countries, states, districts etc., avoid disputes.

(iii) Locality plans help in identifying location of houses and offices in the area.

(iv) Road maps help travellers and tourist.

(v) Topographic maps showing natural features like rivers, streams, hills, forests help in planning irrigation projects and flood control measures.

(vi) For planning and estimating project works like roads, bridges, railways, airports, water supply and waste water disposal surveying is required.

(vii) Marine and hydrographic survey helps in planning navigation routes and harbours.

(viii) Military survey is required for strategic planning.

(ix) Mine surveys are required for exploring minearl wealth.

(x) Geological surveys are necessary for determining different strata in the earth crust so that proper location is found for reservoirs.

(xi) Archeological surveys are useful for unearthing relics of antiquity.

(xii) Astronomical survey helps in the study of movements of planets and for calculating local and standard times.

PLANE SURVEYING ON CIVIL ENGINEERING PROJECTS BASIC INFORMATION AND TUTORIALS


What Is Plane Surveying? How Plane Surveying Works?

In the past, most survey work depended on triangulation from known fixed points using a theodolite and this may still be a suitable method for smaller sites. Again it is necessary to ensure the instrument is in good condition and that its base is truly horizontal.

Readings taken on both faces of the instrument may reduce residual errors. Setting out by taping along a line given by the theodolite may also still be the clearest way of providing centre lines or points, particularly for regular structure layouts such as building columns.

The appropriate time for this is when blinding concrete has been placed to column and wall foundations. The base line, which is either the centre line of the building, or a line parallel to it but clear of the building, should have been set out previously by end pegs sited well clear of the work.

It is usual to work from co-ordinates along this base line from some fixed zero point, and measuring right angle distances out from them. In this way lines of walls and column centres can be marked on the blinding concrete.

Distances may be measured by steel or fibreglass tape pulled horizontally, so it is a great convenience if the site is level. If not a plumb bob has to be used to transfer distances. Distance co-ordinates along the base line from the zero peg are set out, using the steel tape and marking a pencil line across the peg.

The theodolite is set out over the pencil line, and its position is adjusted laterally so that it transits accurately on the two outermost base line marks. The plumb bob on the theodolite gives the mark for the co-ordinate point, a round headed nail being inserted on this point.

Distances at right angles to the base line are then set out with theodolite and steel tape. The advantage of this method is that the theodolite can sight down into column bases which are usually set deeper than the general formation level. For the assistance of bricklayers and formwork carpenters, sight boards can be provided, with the cross-arm fixed at a given level above formation level and with saw cuts exactly on the lines of sight to be used.

A builder’s line can then be fixed through such saw cuts. An alternative to the foregoing is to set out two base lines at right angles to each other and use theodolite right angle settings from these to give centres for such column bases, etc.

The introduction of EDM equipment has, however, meant that accurate distance and angle measurements can now be made from a single point set up. The instruments work by measuring the time of a wave in travelling from the transmitter to a reflector and back.

Readings may be automatically repeated to improve accuracy. Built-in or add-on equipment allows for automatic data logging, reduction of distances to horizontal and vertical components and for downloading to a computer.

Accuracy over short distances is good. Over longer distances corrections may need to be made for atmospheric conditions which vary from the manufacturers’ setting. The improved accuracy available has meant that setting out on site or general survey work is often done by some form of traversing. By this method the position of two known points is extended by noting the angle to a third point and its distance from the instrument set up over one of the points. Extended traverses should be closed onto another known point to check for errors.

Even with EDM equipment, setting out of regular structures is probably best done using a marked baseline as described above. The equipment also has major advantages in ground surveying since the location and elevation of any point in the area to be surveyed can usually be determined directly from just one or two positions of the instrument.

Data from the instrument can then be downloaded into a computer and with the use of appropriate software, contoured plans of the area can be produced for design or for earthworks measurement purposes.

Acertain amount of planning is necessary to produce the best results by ensuring a regular grid of locations is used for targeting and that any individual feature, such as sharp changes in slope are picked up. As an alternative ranging poles can be used to set out a rough grid and readings at say 20 m intervals between these should give sufficient coverage for accurate plotting.
electrical engineering tutorials